THE TURBINE IS GOING TO REACH THE SHPP OF BARGHE

A NEW HYDRO POWER PLANT SIGNED BM GROUP

BARGHE (ITA). After the pre-assembly of the generator made in the workshop, the turbine designed and produced by Hydroalp has been sent to the construction site and it’s ready to be installed.

The electromechanical works, the complete electrical system MT/BT such us the control and regulating software have been supplied by BM Greenpower.

Icon go backGo Back